It's core business is electricity transmission and distribution for to sites via the grid owned by Kazzinc.
Kazzinc-Energo performs testing and diagnostics of network equipment and upgrading and reconstruction of the power assets.
The overhead power line No.31 commissioned in 2011 is an achievement, in which Kazzinc-Energo justifiably takes pride. A 100 km high-voltage line crosses hard-to-reach mountain taiga area 600-1800 m above sea level.
The workers had to work above the cloud line to construct it.