12.05.2020
Ust-Kamenogorsk Metallurgical Complex
All these operations share a common infrastructure. The plants sharing the same site form a unique process flowsheet with maximum possible integrated recovery of valuable components from the feed into the value-added products.
12.05.2020
Kazzinc-Energo
It's core business is electricity transmission and distribution for to sites via the grid owned by Kazzinc.
12.05.2020
Kazzinc-Trans
The core business of Kazzinc-Trans is truck transportation of cargo and passengers.
12.05.2020
Kazzinc-Remservis
The core mission of Kazzinc-Remservis is maintenance and repairs of equipment, hoisting machines, boilers, vessels and pipelines operated by Kazzinc.
12.05.2020
Kazzinc-Avtomatika
Kazzinc-Avtomatika was the first in Kazakhstan to introduce a leaky feeder communication system of Canadian origin covering all underground workings in Ridder-Sokolny and Tishinsky mines.
12.05.2020
Kazzinc-TemirTrans
Kazzinc-TemirTrans operates railway tracks, rolling stock and cargo terminals.
12.05.2020
Maleyevsky mine
The Company’s largest underground operation was commissioned in June 2000.
12.05.2020
Altay Concentrator
The Concentrator treats the polymetallic and copper-zinc ores from Maleyevsky deposit, as well as copper slags and zinc-bearing Waelz slag. The produced zinc, lead, copper and gold concentrates are railed to Ust-Kamenogorsk Metallurgical Complex.
12.05.2020
Zhairem Mining and Concentrating Complex
Zhairem is one of the largest polymetallic deposits in Kazakhstan with rich zinc-lead, barite-polymetallic and ferriferrous-manganese ore reserves.
12.05.2020
Altyntau-Kokshetay Ltd
An open-cast mining and gold producing subsidiary. On average, Altyntau Kokshetau produces 15 tons of gold annually.
12.05.2020
Dolinny Mine
Dolinny is a new mine, its construction started in 2015.
12.05.2020
KazzincMash
KazzincMash produces sophisticated machinery such as flotation cells, ball and rod mills, cone crushers, ceramic filters and ultrafine mills.
12.05.2020
Kazzinc-Shakhtostroy
Kazzinc-Shakhtostroy covers a wide range of capital and preproduction development, exploration, installation and electrical maintenance works.
12.05.2020
Ridder Concentrator
The ore from Tishinsky, Shubinsky and Ridder-Sokolny mines and gold-bearing tailings accumulated in the abandoned TSF are treated at the Ridder Concentrator. Given a wide variety of ore types, the Concentrator has various processing circuits. The Concentrator produces ore concentrates processed at the metallurgical facilities of Ust-Kamenogorsk and Ridder complexes.
12.05.2020
Ridder Metallurgical Complex
The Complex is primarily fed by the concentrates from Ridder Concentrator.
12.05.2020
Tishinsky mine
The first-ever mine in Kazakhstan adequately equipped to mine by mobile machinery.
12.05.2020
Ridder-Sokolny Mine
More than a 200-year history of mining at Ridder-Sokolny dates back to 1789.
12.05.2020
Bukhtarma Hydro Power Complex
The hydro power station is operated by Kazzinc under a long-term concession agreement.